EEC Galva was entrusted by a Danish customer to re-galvanize over 12000 solar panel posts for a Solar park in Benban, Aswan.
The posts arrived in Egypt from Denmark with various defects attributed to the effects of the environment during transportation.
EEC Galva coordinated the logisitics of transporting the posts to the EEC Galva facility to galvanize the posts according to ISO 1461, and delivered the posts within an ambitious tight schedule.